Analysis of Column Requirements in the Puri Indah Mall Parking Building

Main Article Content

Nurina Yasin
Prayoga Afqar Idlan
Asri wulan
Tri Handayani

Abstract

The construction of a parking building requires meticulous technical planning and implementation in compliance with standards to ensure the quality and safety of the structure. Concrete columns serve as the primary vertical structural elements with a crucial role in distributing loads to the foundation. This study aims to examine the implementation methods for column construction on the 6th floor, Zone 1, of the Puri Indah Mall Parking Building, identify issues encountered and their solutions, and calculate the required volume of concrete and the number of truck mixers needed.The findings indicate that the implementation methods encompass the following stages: determining the column axis, fabricating and installing reinforcements, installing column shoes and concrete decking, quality inspection, casting, formwork dismantling, column curing, and installing corner guards. The total concrete requirement for the columns on the 6th floor, Zone 1, is 8.246 m³, with a total of 2 truck mixers needed.This study provides practical contributions in the form of an efficient and standardized guide for column construction work, as well as material requirement calculations that can be adapted for similar projects. The implications of these findings support the optimization of resources and logistics in the management of sustainable construction projects.

Article Details

Section

Articles

References

Ahmad, nayvel. (2017). Metode Pelaksanaan Konstruksi Diafragma Wall. https://www.academia.edu/34188890/Metode_Pelaksanaan_KonstruksiDiafrag ma_Wall. (Di akses pada tanggal 9 Oktober 2024 Pukul 12:13).

Amahu, J. C. (2020). ”Metode Pelaksanaan Pekerjaan Ramp”. Laporan Kerja Praktek Universitas Gunadarma, Depok.

Amalia, Ismiy. (2017). Metode Pekerjaan Tangga. https://id.scribd.com/ document/346901990/Metode-Pekerjaan-Tangga-x. (Di akses pada tanggal 9 Oktober 2024 Pukul 12:15).

Ana, (2018). Pelaksanaan Parapet. https://id.scribd.com/document/39415 0320/Pelaksanaan-Parapet (Di akses pada tanggal 9 Oktober 2024 Pukul 12:20).

Budi, Sentosa. (2009). Manajemen proyek: Konsep dan implementasi. Edisi Kesatu.

Graha Ilmu, Yogyakarta.

Dimyati, D. H., dan Nurjaman, K. (2014). Manajemen Proyek. Edisi Kesatu. Pustaka Setia, Yogyakarta.

Hutagalung, Jefri. (2014). Metode Pelaksanaan Mat Foundation. https://jefrihutagalung.wordpress.com/2014/03/03/metode-pelaksanaan- mat- foundation-pondasi-rakit. (Di akses pada tanggal 9 Oktober 2024 Pukul 12:15).

Juniarti, Reni. (2018). Laporan Berkala Kemajuan Proyek. https://renijuniarti.blogspot.com/2018/07//laporan-berkala-kemajuan.html. (Di akses pada tanggal 9 Oktober 2024 Pukul 12:30).

Khanif, Muhammad. (2012). “Unsur-Unsur Terkait Dalam Organisasi Proyek Infrastruktur”. vol. 9., No.1. pp. 17-19.

PBI. (1971). Peraturan Beton Bertulang Indonesia. Departemen Pekerjaan Umum dan Tenaga Listrik, Bandung.

Purba, Samuel. (2022). “Proyek Pembangunan Gedung Parkir Supermarket”. Laporan Kerja Praktek Proyek Pembangunan Gedung Parkir, Medan.

Puspitasari, N. B., dan Arianie, G. P. (2017). “Perencanaan Manajemen Proyek Dalam Meningkatkan Efisiensi dan Efektifitas Sumber Daya Perusahaan”. Jurnal Teknik Industri, vol. 12. pp. 189-196.

Putri, Gebiya. (2022). Perencanaan Proyek: Pengertian, Manfaat, Hingga Kendala. https://www.tomps.id/perencanaan-proyek. (Di akses pada tanggal 9 Oktober 2024 Pukul 13:01).

Putriani, Leny., dan Ikhwanudin. (2023). “Pelaksanaan Pekerjaan Struktur Atas Balok dan Pelat Lantai Proyek Pembangunan Rumah Susun Polresta Pati”. Jurnal Tenik Sipil, vol. 1., No. 29. pp 94 – 100.

SNI 2052. (2017). Baja Tulangan Beton. Badan Standardisasi Nasional, Jakarta.

SNI 2847. (2013). Persyaratan Beton Struktural Untuk Bangunan Gedung. Badan Standardisasi Nasional, Jakarta.