Improving Renovation Project Timeliness at PT XYZ Using CPM and PERT

Main Article Content

Mukhamad Abduh
Michaelia Titan Salsabila

Abstract

Building renovation projects require efficient labor scheduling to meet project deadlines, involving complex activities that demand good coordination between various departments. Careful planning is essential to ensure the project is completed on time and within budget. This research evaluates project scheduling in terms of activity duration and cost estimation for the renovation project at PT XYZ, using the CPM (Critical Path Method) and PERT (Project Evaluation Review Technique) methods to identify the project's critical path. While CPM follows a deterministic approach, PERT utilizes a probabilistic one.


The research shows that by using CPM and PERT, project scheduling can be optimized for timely completion and cost-effectiveness. Based on calculations, the CPM method was found to be more efficient in scheduling and cost management. The results indicate that the renovation project has an 82% probability of completion within 82 days, saving 6 days compared to the original schedule.

Article Details

Section

Articles

References

Alaghbari W, A. S. (2019). Factors Affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), 79–91. https://doi.org/10.1080/15623599.2017.1382091.

Alcaesar M R, E. S. (2022). Analisis waktu pelaksanaan proyek menggunakan simulasi monte carlo (Studi kasus : Proyek Rehabilitasi Jalan Sentul – Teras Bendung-Tirtayaa Kabupaten Serang – Banten TA. Teknika: Jurnal Teknik, 10(1), 79-89.

Alejandro Prieto, e. (2024). Renovation process challenges and barriers: addressing the communication and coordination bottlenecks in the zero-energy building renovation workflow in European residential buildings. VOL. 67, NO. 3, 205–217. https://doi.org/10.1080/00038628.2023.2214520.

Berthier, A. A. (2022). Unrelated Parallel MachinesScheduling with Dependent Setup Times in TextileIndustry. Computers & Industrial Engineering, 174 (108):736. 108736. https://doi.org/10.1016/j.cie.2022.

Ervianto, W. I. (2017). Tantangan Pembangunan Infrastruktur dalam Proyek Strategis Nasional Indonesia. Simp. II UNIID 2017, vol. 2, no. 1, 2017.

Yusuf, M. A. (2021). Pengertian Tenaga Kerja . Retrieved from Gramedia.com: https://www.gramedia.com/literasi/pengertian-tenaga-kerja/

Ginting, R. (2009). Penjadwalan Mesin. Graha Ilmu.

Ismael, I. (2013). Keterlambatan Proyek Konstruksi Gedung Faktor Penyebab dan Tindakan Pencegahannya. Jurnal Momentum, ISSN: 1693-752X 14.

Kerzner, H. (2009). Project management: A systems approach to planning, scheduling, and con-rolling. Hoboken: NJ: John Wiley & Sons.

Le N H, et. at. (2019). Effects of foreign direct investment and human capital on labor productivity: Evidence from Vietnam. Journal ofAsian Finance, Economics & Business, 16(3), 123–130. https://doi.org/10.13106/jafeb.2019.vol6.no3.123.

Marzieh Aghileh, et. al. (2024). Multi-project scheduling under uncertainty and resourceflexibility: a systematic literature review. Journal of PRODUCTION & MANUFACTURING RESEARCH, VOL. 12, NO. 1, 2319574.

Nurhayati. (2010). Manajemen Proyek. Yogyakarta: Graha Ilmu.

SA. (2022). Renovasi Gedung Kantor: Pengertian & Pra Rencana. Retrieved from Solusi Bangunan: https://solusibangunan.id/renovasi-gedung-kantor- pengertian-pra-rencana

Syahrur Romadhona, et. al. (2021). Project Scheduling Analysis Using the Precedence Diagram Method (PDM) Case Study: Surabaya’s City Outer East Ring Road Construction Project (Segment 1). International Journal of Engineering, Science & InformationTechnology (IJESTY). , Volume 1, No. 2 (2021) pp. 53-61.

.Suhendar, S. U. (2021). Implementasi Metode Critical Path Method Pada Proyek Synthesis. Jurnal Optimasi Teknik Industri, vol. 3, no. 1.

Tantyonimpuno, S. (2001). Manajemen Proyek. Surabaya: Institut Teknologi Sepuluh Nopember